A calculation model for the head-on resistance of rock pipe jacking based on the rock breaking characteristics of the disc cutter
-
摘要:
顶进力是顶管工程设计和施工中最重要的参数之一, 顶进力计算的精确性将直接影响顶管的工程的成败。随着顶管施工工艺越来越多的应用于岩石地层, 但鲜有关于岩石地层中顶管顶进力的计算模型。为了更加准确地计算岩石地层中的迎面阻力, 假设掌子面稳定, 通过分析岩石顶管机刀盘滚刀破岩机理、受力模型和影响规律, 在此基础上推导出岩石地层顶管迎面阻力计算公式。结果表明: 岩石顶管中, 岩石抗压强度和抗剪强度以及顶管机滚刀切入深度直接决定了迎面阻力的大小, 实测迎面阻力除个别点在计算值上下限以外, 其余与公式预测值相一致, 证明其具有适用性。
Abstract:Jacking force is one of the most important parameters in the design and construction of pipe jacking. The accuracy of the jacking force will directly affect the success or failure of the pipe jacking project. Pipe jacking is increasingly applied to rock formations, but there are few calculation models for the jacking force in rock formations. To calculate the head-on resistance in the rock formation more accurately, a new calculation formula of the construction face resistance during pipe jacking is derived. The pipe jacking face is assumed to be stable; the rock pipe jacking force is analyzed by consideration of the rock breaking mechanism, force model and influence law of the rock pipe jacking machine cutter head hob. The results show that in rock pipe jacking, the compressive and shear strengths of the rock and the depth of the pipe jacking hob cut into the rock directly determine the value of the head-on resistance; after determining the appropriate hob spacing, the number of tools is not blindly increased; otherwise, the rock breaking effect of each hob will be affected. Moreover, the measured head-on resistance in engineering practice is consistent with the predicted value of the formula, which proves its applicability.
-
Key words:
- pipe jacking in rock /
- jacking force /
- head-on resistance /
- disc cutter
-
表 1 青云河顶管工程参数表
Table 1. Buried depth of pipes and corresponding formation parameters of the Qingyunhe pipe jacking project
里程/m 管道埋深/m 岩石单抗压强度下限/MPa 岩石单轴抗压强度上限/MPa 岩石单轴抗压强度平均值/MPa 26.01 10.02 37.2 43.8 41.23 106.17 15.15 38.5 46.6 42.70 164.64 12.24 34.7 65.9 40.88 318.29 7.33 48.8 62.6 54.97 425.37 10.16 30.2 50.5 41.70 448.63 8.08 30.8 31.4 31.10 494.41 5.98 44.2 44.2 44.20 -
[1] 马保松. 非开挖工程学[M]. 北京: 人民交通出版社, 2008.Ma B S. The science of trenchless engineering[M]. Beijing: China Communications Press, 2008(in Chinese). [2] 刘广仁, 常喜平, 王乐. 复合地层纵向曲线顶管施工技术[J]. 地质科技情报, 2016, 35(2): 67-70. https://www.cnki.com.cn/Article/CJFDTOTAL-DZKQ201602016.htmLiu G R, Chang X P, Wang L. Longitudinal curve pipe jacking construction technology in composite stratum[J]. Geological Science and Technology Information, 2016, 35(2): 67-70(in Chinese with English abstract). https://www.cnki.com.cn/Article/CJFDTOTAL-DZKQ201602016.htm [3] 冯锐, 张鹏, 苏树尧, 等. 大口径长距离钢顶管注浆减阻技术: 以黄浦江上游水源地连通管工程为例[J]. 地质科技通报, 2020, 39(4): 174-180. doi: 10.19509/j.cnki.dzkq.2020.0421Feng R, Zhang P, Su S Y, et al, Resistance reduction by grouting to large diameter and long distance steel pipe jacking: A case study of pipe jacking project in the upstream water source area of Huangpu River[J]. Bulletin of Geological Science and Technology, 2020, 39(4): 174-180(in Chinese with English abstract). doi: 10.19509/j.cnki.dzkq.2020.0421 [4] 周浩, 周千淼, 谈力昕, 等. 考虑注浆作用的矩形顶管竖向土压力计算模型[J]. 地质科技通报, 2021, 40(2): 125-130. https://www.cnki.com.cn/Article/CJFDTOTAL-DZKQ202102015.htmZhou H, Zhou Q M, Tan L X, et al, Vertical soil pressure calculation model of rectangular box jacking considering grouting effect[J]. Bulletin of Geological Science and Technology, 2021, 40(2): 125-130(in Chinese with English abstract). https://www.cnki.com.cn/Article/CJFDTOTAL-DZKQ202102015.htm [5] Evans I, Pometry C D. The strength fracture and workability of coal[M]. London: Pergamon Process, 1976. [6] Roxborough F F. Rock excavation by disc cutter: Authors reply to the Discussion on F.F. Roxborough and H.R. Philli's paper, Int. J. Rock Mech. Min. Sci. & Geomech. Abstr. 12, 361-366(1975), by K.L. Meijer, Int. J. Rock Mech. Min. Sci. & Geomech. Abstr. 13, 297(1976)[J]. International Journal of Rock Mechanics & Mining Sciences & Geomechanics Abstracts, 1976. [7] 秋三藤三郞. デイスクカツタ一岩石破壞理论[J]. 小松技術ミヤ一ナル, 1970, 16(3): 56-61.Tosaburo Akiyama. A theory of the rock-breaking function of the disc cutter[J]. Komatsu Technology, 1970, 16(3): 56-61(in Japanese with English abstract). [8] Ozdemir L, Miller R, Wang F D. Mechanical tunnel boring prediction and machine design(annual report)[R]. Colorado School of Mines, 1977. [9] 徐小何, 余静. 岩石破碎学[M]. 北京: 煤炭工业出版社, 1984.Xu X H, Y J. The science of trenchless engineering[M]. Beijing: China Communications press, 2008(in Chinese). [10] 张厚美. TBM的掘进性能数值仿真研究[J]. 隧道建设, 2006, 26(2): 1-7. doi: 10.3969/j.issn.1672-741X.2006.02.001Zhang H M. Study on numerical simulations of performance of tunnel boring machines(TBM)[J]. Tunnel Construction, 2006, 26(2): 1-7(in Chinese with English abstract). doi: 10.3969/j.issn.1672-741X.2006.02.001 [11] 朱齐平, 刘希太, 潘存治. 全断面掘进机(TBM)刀盘总推进力的分析计算[J]. 矿山机械, 2006(11): 20-21. https://www.cnki.com.cn/Article/CJFDTOTAL-KSJX200611007.htmZhu Q P, Liu X T, Pan C Z. Analysis and calculation to the general propping force of the cutter head of the full-face tunnel boring machine(TBM)[J]. Mining & Processing Equipment, 2006(11): 20-21(in Chinese with English abstract). https://www.cnki.com.cn/Article/CJFDTOTAL-KSJX200611007.htm [12] 张宁川. 硬岩掘进机刀盘纯切削扭矩计算研究[J]. 隧道建设, 2008, 28(6): 638-645. https://www.cnki.com.cn/Article/CJFDTOTAL-JSSD200806003.htmZhang N C. Study on cutting torque calculation of cutterhead of hard rock TBM[J]. Tunnel Construction, 2008, 28(6): 638-645(in Chinese with English abstract). https://www.cnki.com.cn/Article/CJFDTOTAL-JSSD200806003.htm [13] Gertsch R, Gertsch L, Restami J. Disc cutting tests in Colorado Red Granite: Implications for TBM performance prediction[J]. International Journal of Rock Mechanics and Mining Sciences, 2007, 44(2): 238-246. doi: 10.1016/j.ijrmms.2006.07.007 [14] 张照煌, 纪昌明. 全断面岩石掘进机盘形滚刀刃破岩点弧长的解析解及应用研究[J]. 应用基础与工程科学学报, 2009, 17(2): 265-273. doi: 10.3969/j.issn.1005-0930.2009.02.012Zhang Z H, Ji C M. Analytic solution and it's usage of arc length of rock breakage point of disc edge on full face rock tunnel boring machine[J]. Journal of Basic Science and Engineering, 2009, 17(2): 265-273. (in Chinese with English abstract). doi: 10.3969/j.issn.1005-0930.2009.02.012