Optimization of 4D Hydrogeological Processes Monitoring Through Cross-hole Electrical Resistivity Tomography (CHERT) using Bayesian experimental design
-
摘要: 【目的】地球物理方法可以有效监测四维水文地质过程中水流的动态和物质的传输,其成像精度往往与监测布置方案密切相关。以常用的高密度电阻率法ERT为例,为了获得良好的成像精度往往需要大量的电极排列,导致监测时间较长,因而不能实时响应四维水文地质动态过程。已有ERT监测方案优化研究多侧重地表ERT,很少针对跨孔ERT。【方法】由于跨孔ERT在研究区域高精度刻画方面更具优势,本研究提出采用贝叶斯实验设计优化跨孔ERT监测方案。通过室内静态/动态试验以及野外场地,对比优化电极排列与传统电极排列的测量用时与测量精度,验证贝叶斯实验设计优化方案的有效性。【结果】室内试验结果表明:优化后监测方案能减少约75%的测量用时,而且优化方案反演结果能更精准地动态刻画电阻异常区域,显著改善传统方案监测四维水文地质过程的滞后性误差。野外场地试验验证表明:在保证监测精度的前提下优化方案可减少约95%的监测时间。【结论】基于贝叶斯实验设计优化跨孔ERT电极排列监测方案为四维水文地质过程的高效监测提供了技术支撑。Abstract: (Objective) The geophysical method can effectively monitor the dynamics of water flow and material transport in 4-D hydrogeological processes, and its imaging accuracy is often closely related to the monitoring scheme. Taking the commonly used Electrical resistivity tomography (ERT) as an example, in order to obtain good imaging accuracy, a large number of electrode arrangements are often required, which leads to a long monitoring time and therefore cannot timely respond to the 4-D hydrogeological dynamic process. Most of the existing ERT monitoring scheme optimization studies focus on surface ERT, and few focus on cross-hole ERT. (Methods) Since cross-hole ERT has more advantages in the high-precision characterization of the study area, this study proposed to optimize the monitoring scheme of cross-hole ERT by Bayesian experimental design. By comparing the measurement time and accuracy of the optimized electrode arrangement with the traditional electrode arrangement through indoor static/dynamic tests and field sites, the validity of the optimization scheme of Bayesian experimental design was verified. (Results) The laboratory test results showed that the optimized monitoring scheme could reduce the measurement time by about 75%, and the inversion results of the optimized scheme could more accurately depict the dynamic resistance anomaly region, significantly improving the hysteresis error of the traditional scheme monitoring the 4-D hydrogeological process. Field test shows that the optimized scheme can reduce about 95% monitoring time under the premise of ensuring monitoring accuracy. (Conclusion) Optimizing the monitoring scheme of cross-hole ERT electrode arrangement based on Bayes experiment design provides technical support for efficient monitoring of 4-D hydrogeological processes.
点击查看大图
计量
- 文章访问数: 166
- PDF下载量: 22
- 被引次数: 0