Zhou Hao, Zhou Qianmiao, Tan Lixin, Zhang Peng, Ma Baosong. Vertical soil pressure calculation model of rectangular box jacking considering grouting effect[J]. Bulletin of Geological Science and Technology, 2021, 40(2): 125-130. doi: 10.19509/j.cnki.dzkq.2021.0201
Citation: Zhou Hao, Zhou Qianmiao, Tan Lixin, Zhang Peng, Ma Baosong. Vertical soil pressure calculation model of rectangular box jacking considering grouting effect[J]. Bulletin of Geological Science and Technology, 2021, 40(2): 125-130. doi: 10.19509/j.cnki.dzkq.2021.0201

Vertical soil pressure calculation model of rectangular box jacking considering grouting effect

doi: 10.19509/j.cnki.dzkq.2021.0201
  • Received Date: 08 Jun 2020
  • In view of the current situation that there are few studies on the calculation model of the vertical soil pressure on the rectangular box jacking, the calculation model of the soil pressure on the rectangular box jacking considering the grouting effect is established based on the Terzaghi soil pressure calculation theory and combined with the characteristics of the rectangular box jacking engineering, and an improved calculation formula of the soil pressure on the rectangular box jacking is proposed.Based on the real-time monitoring data of vertical soil pressure in a rectangular box jacking project in Suzhou, the variation rules were explored and the accuracy of the calculation formula was verified.The results show that the shear zone in the soil is generated from both sides of the pipe wall and develops in the vertical direction, and can penetrate to the surface; under the critical state, the frictional angle of the shear zone is fully developed, and the friction coefficient of the shear zone is calculated by the critical internal friction angle and its sinusoidal value; under different grouting pressures, "active soil arch" and "passive soil arch" may appear above the pipeline.The comparative analysis between the calculated value and the measured value shows that the improved calculation method can better envelop the vertical earth pressure range of the rectangular box pipe.

     

  • loading
  • [1]
    Ma B, Najafi M. Development and applications of trenchless technology in China[J]. Tunnelling and Underground Space Technology, 2008, 23(4): 476-480. doi: 10.1016/j.tust.2007.08.003
    [2]
    周浩, 马保松, 赵阳森, 等. 多因素下大断面矩形顶管施工对地层竖向变形影响研究[J]. 隧道建设, 2020, 40(9): 1324-1332. https://www.cnki.com.cn/Article/CJFDTOTAL-JSSD202009013.htm
    [3]
    李剑, 张鹏, 李志宏. 顶管施工润滑泥浆压力引起的土体附加应力计算[J]. 地质科技情报, 2016, 35(2): 28-32. https://www.cnki.com.cn/Article/CJFDTOTAL-DZKQ201602006.htm
    [4]
    张鹏, 谈力昕, 马保松. 考虑泥浆触变性和管土接触特性的顶管摩阻力公式[J]. 岩土工程学报, 2017, 39(11): 2043-2049. doi: 10.11779/CJGE201711012
    [5]
    张海丰, 周维, 张鹏, 等. 管土相互作用土箱模型实验设计[J]. 地质科技情报, 2016, 35(4): 219-222. doi: 10.3969/j.issn.1009-6248.2016.04.014
    [6]
    姜伟, 赵文平, 董威, 等. 大断面矩形顶管周围土压力与顶推力计算方法[J]. 内蒙古科技大学学报, 2019, 38(4): 375-379. https://www.cnki.com.cn/Article/CJFDTOTAL-BTGX201904014.htm
    [7]
    杨仙, 张可能, 黎永索, 等. 深埋顶管顶力理论计算与实测分析[J]. 岩土力学, 2013, 34(3): 757-761. https://www.cnki.com.cn/Article/CJFDTOTAL-YTLX201303024.htm
    [8]
    李方楠, 沈水龙, 罗春泳. 考虑注浆压力的顶管施工引起土体变形计算方法[J]. 岩土力学, 2012, 33(1): 204-208. doi: 10.3969/j.issn.1000-7598.2012.01.032
    [9]
    王忠凯, 徐光黎. 盾构施工对既有建(构)筑地基承载力影响及加固土体稳定性分析[J]. 地质科技通报, 2020, 39(4): 109-116. http://dzkjqb.cug.edu.cn/CN/abstract/abstract10006.shtml
    [10]
    Terzaghi K. The shearing resistance of saturated soils and the angle between planes of shear[C]//Proc. of Int. Conf. on Smfe. 1936: 1.
    [11]
    Zhang H, Zhang P, Zhou W, et al. A new model to predict soil pressure acting on deep burial jacked pipes[J]. Tunnelling and Underground Space Technology, 2016, 60: 183-196. doi: 10.1016/j.tust.2016.09.005
    [12]
    Terazaghi K. Theoretical soil mechanics[M]. New York: John Wiley and Sons, 1945.
    [13]
    中华人民共和国建设部. GB50332-2017给水排水工程管道结构设计规范[S]. 北京: 中国技术出版社, 2017.
    [14]
    上海市政工程设计研究总院. 给水排水工程顶管技术规程[M]. 北京: 中国计划出版社, 2008.
    [15]
    邹超, 姜玉松. 注浆对土体力学性能的影响[C]//中国岩石力学与工程学会锚固与注浆分会. 第四届中国岩石锚固与注浆学术会议论文集. 北京: 中国电力出版社, 2007: 87-91
    [16]
    何超, 张鹏, 马保松. 拱北隧道管幕工程顶管间距计算分析[J]. 隧道建设, 2019, 39(1): 94-101. https://www.cnki.com.cn/Article/CJFDTOTAL-JSSD201901015.htm
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article Views(463) PDF Downloads(899) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return