Citation: | Feng Rui, Zhang Peng, Su Shuyao, Ma Baosong. Resistance reduction by grouting to large diameter and long distance steel pipe jacking:A case study of pipe jacking project in the upstream water source area of Huangpu River[J]. Bulletin of Geological Science and Technology, 2020, 39(4): 174-180. doi: 10.19509/j.cnki.dzkq.2020.0421 |
[1] |
马保松, Stein D, 蒋国盛, 等.顶管和微型隧道技术[M].北京:人民交通出版社, 2004:4-8.
|
[2] |
魏纲, 徐日庆, 邵剑明, 等.顶管施工中注浆减摩作用机理的研究[J].岩土力学, 2004, 25(6):930-934. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=ytlx200406019
|
[3] |
简崇林, 马孝春.长距离顶管工程中注浆减摩作用机理及效果分析[J].探矿工程:岩土钻掘工程, 2010, 37(12):65-73. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=tkgc201012018
|
[4] |
Namli M, Guler E.Effect of bentonite slurry pressure on interface friction of pipe jacking[J].Journal of Pipeline Systems Engineering and Practice, 2017, 8(2):04016016. doi: 10.1061/(ASCE)PS.1949-1204.0000255
|
[5] |
Wang M S.Test of thixotropic slurry properties and study of resistance-reducing technology for pipe jacking tunnel construction[J].Modern Tunnelling Technology, 2016, 53:182-189. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=xdsdjs201606024
|
[6] |
Oreilly M P, Rogers C D F.Pipe jacking forces[C]//Anon.Proceedings of an International Conference on Foundations and Tunnels.Edinburgh: Engineering Technics Press, 1987: 201.
|
[7] |
Chapman D N.Graphical method for predicting ground movements from pipe jacking[J].Proceedings of the Institution of Civil Engineers, Geotechnical Engineering, 1999, 137(2):87-96. doi: 10.1680/gt.1999.370203
|
[8] |
Milligan G W E, Norris P.Site-based research in pipe jacking objectives, procedures and a case history[J].Tunneling and Underground Space Technology, 1996, 11(1):3-24. doi: 10.1016/0886-7798(96)00045-4
|
[9] |
Hideki S, Saeid K, Kikuo M.Small diameter tunnel excavation method using slurry pipe-jacking[J].Geotechnical and Geological Engineering, 2004, 22(2):161-186. doi: 10.1023/B:GEGE.0000018365.84174.ea
|
[10] |
Jefferis S A, Grouts S.Chapter 48 of construction materials reference book[M].Doran D K:Butterworth-Heineman, 1992.
|
[11] |
李万才.大口径长距离顶管工程注浆减摩技术[J].管道技术与设备, 2000(6):11-18. http://www.cqvip.com/Main/Detail.aspx?id=4771751
|
[12] |
汤华深, 刘叔灼, 莫海鸿.顶管侧摩阻力理论公式的探讨[J].岩土力学, 2004, 25(增刊2):574-576. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=ytlx2004z2121
|
[13] |
Ye Y C, Peng L M, Yang W C.Calculation of jacking force for pipe-jacking considering mud slurry thixotropy[J].Journal of Geotechnical Engineering, 2015, 37:1653-1659. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=ytgcxb201509012
|
[14] |
刘广仁, 常喜平, 王乐.复合地层纵向曲线顶管施工技术[J].地质科技情报, 2016, 35(2):67-70. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=dzkjqb201602016
|
[15] |
王双, 夏才初, 葛金科.考虑泥浆套不同形态的顶管管壁摩阻力计算公式[J].岩土力学, 2014, 35(1):159-166, 174. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=ytlx201401024
|
[16] |
王福芝, 曾聪, 孔耀祖.大直径长距离顶管润滑泥浆方案研究[J].地质科技情报, 2016, 35(2):49-52. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=dzkjqb201602012
|
[17] |
李剑, 张鹏, 李志宏.顶管施工润滑泥浆压力引起的土体附加应力计算[J].地质科技情报, 2016, 35(2):23-27. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=dzkjqb201602006
|
[18] |
刘嘉淳, 李志华, 谈力昕, 等.泥水平衡顶管技术在商周高速穿越工程中的应用[J].地质科技情报, 2016, 35(2):28-32. http://www.wanfangdata.com.cn/details/detail.do?_type=perio&id=dzkjqb201602007
|
[19] |
给水排水工程顶管技术规程: CECS 246-2008[S].北京: 中国计划出版社, 2008.
|